By Agus Setiawan, Production Supervisor · published · Last updated .

A factory's cost is knowable in parts. Three of the parts have instruments you can open yourself — a governor's decree for wages, a published tariff for electricity, and a market review and a parliamentary brief for raw material. The rest depend on how a particular plant runs. And two parts decide the answer: the shell-charcoal price, which the market sets, and the loss, which no factory publishes, including this one.

Carbonization stage
Coconut shell is carbonized before it is ever pressed: the shell is converted to charcoal, then ground, and only the resulting powder enters the briquette line.

The short answer

There is no single number, and a page that gives you one is quoting a plant it does not run. Below are the lines themselves: three anchored to documents you can open, the rest named and left open, because inventing them would make this page less useful rather than more.

Labour: one province, one decree, 27 answers

Indonesian minimum wages are set district by district. A single West Java decree — Keputusan Gubernur Jawa Barat Nomor 561.7/Kep.862-Kesra/2025, on Upah Minimum Kabupaten/Kota Tahun 2026, set in Bandung on 24 December 2025 and payable from 1 January 2026 — fixes 27 different monthly minimums. The floor is Kabupaten Pangandaran at Rp 2,351,250; the ceiling is Kota Bekasi at Rp 5,999,443. That is a spread of about 2.55× under one instrument, in one province, on location alone.

Our factory is in Kabupaten Bogor, which the same decree sets at Rp 5,161,769. We use that row because that is where production happens. A supplier's registered address and its factory are not always the same place, and for a cost model it is the factory that counts.

And here is the caveat that matters more than the number. The decree binds one category of worker. Diktum KETIGA: the minimum "hanya berlaku bagi pekerja dengan masa kerja kurang dari 1 (satu) tahun" — it applies only to workers with less than one year of service. Beyond a year, diktum KELIMA puts the employer on its own wage structure and scale; diktum KEENAM exempts micro and small enterprises from the floor altogether. So a labour line built on the minimum wage models a first-year workforce at a business above the small-enterprise threshold. It is a floor for a new hire, not a wage bill, and a cost model that treats it as one will understate every experienced operator on the line.

What we do not publish is the other half of that line: how many people a tonne takes. A wage becomes a cost per tonne only when divided by output, and we publish no output figure — here or anywhere else on this site. The same limit applies to the tariff in the next section, and it is the reason neither line appears in the table further down.

Electricity: a number with a three-month shelf life

PLN non-subsidised tariff bands, quarter to September 2026
Band Tariff
I-3 / medium voltage, above 200 kVA Rp 1,122 / kWh
I-4 / high voltage, from 30,000 kVA Rp 997 / kWh
B-2 / low voltage, 6,600 VA to 200 kVA Rp 1,445 / kWh

Those are the non-subsidised bands held for the quarter to September 2026 (cnbcindonesia.com, 10 August 2026). The mechanism is the more useful fact. Under Peraturan Menteri ESDM No. 7 of 2024 the tariff is re-set every three months against four macroeconomic parameters — the rupiah exchange rate, the Indonesian Crude Price, inflation and the coal reference price. A cost model built on one quarter's figure is out of date within a quarter by design, which is the opposite of how most published cost breakdowns treat the energy line.

Carbonized shell stockpile
Between carbonization and grinding the charcoal is held as chunk, and it is during this holding period that fresh carbon sheds the reactivity that makes newly made charcoal self-heat.

Raw material: the one line with a public price

Two public prices, four years apart, and the gap is the point. The International Coconut Community, an intergovernmental body of coconut-producing countries, recorded Indonesian shell charcoal at USD 622 per tonne in December 2024 and USD 1,045 per tonne in July 2025 (Market Review of Coconut Shell Charcoal, August 2025); its April 2026 review finds prices still elevated into early 2026. Why it moved: price per ton drivers.

The older price is from an April 2022 brief by the Pusat Kajian Anggaran DPR RI, the parliament's budget research centre (Budget Issue Brief, Vol. 02, Ed. 06), which we read in full. It gives coconut charcoal at Rp 6,000 per kg, briquettes at up to Rp 14,000 per kg and an export value of up to USD 1,300 per tonne, at its own Rp 14,300 to the dollar, naming no source and no year for any of them. At that rate Rp 6,000 per kg is about USD 420 per tonne. The brief states that its content is the author's responsibility, not the official view of the DPR's Expertise Agency.

That 2022 figure still circulates: Kuntoro Boga, a director at the agriculture ministry, repeated it as the price of carbonized shell in a signed opinion column (agri.kompas.com, 8 December 2025). By mid-2025 the market was well above it. And the brief's term is arang kelapa, coconut charcoal — not specified as shell charcoal, and with no grade line.

Two things to hold on to. The brief draws no grade distinction, so Rp 6,000 is a floor for the category and not a shisha-grade quote. And USD 1,300 per tonne, the brief's undated export value, is a market average across everything the country exports, not a shisha-grade price, and not a cost-plus floor for any quote.

On yield, the producers' association puts the first conversion at four kilograms of shell to one kilogram of charcoal, with a truck averaging 25 tonnes (Asep Mulyana, Hipbaki, in indonesiamedia.com, 18 September 2021). Read that for what it measures and nothing else. It is a dated trade observation about carbonization — raw shell turning into charcoal, the first conversion. It is a different conversion from the one this page calls decisive, which is the second: charcoal turning into finished, screened, dried, packed briquettes. A 4:1 ratio for the first says nothing about the loss in the second, and treating it as though it did is the commonest way a cost model for this product goes wrong.

The lines nobody publishes, starting with loss

Material loss. Between charcoal arriving and briquettes leaving, material is lost — to grinding, to fines, to shapes that break, to screening, to drying. Whatever does not leave as saleable product was still bought and still processed, so it is paid for twice. Beside the shell price, this is the line that moves the answer most, and it is the line with no public source at all. The peer-reviewed literature on coconut briquettes characterises finished laboratory samples — density, ash, shatter index — and stops there; the trade press quotes the carbonization ratio above and nothing about the second step. We searched for an industrial figure and did not find one.

The others, briefly, each unpublished for the same reason — what moves them is specific to a plant. Binder: a process share rather than a price, ours a typical 1.5–3% of the mix, costing whatever tapioca starch costs that week. Oven fuel: our drying runs 75–85 hours at 160 °C, so the bill turns on what heats the oven and what that fuel costs locally, not on the schedule. Packaging: specified by what the buyer orders, which is why it belongs in a quote rather than a cost model. Maintenance and overhead: dies, screens, rent, compliance, the export desk. Capital cost — what building the plant cost — is a separate question and is out of scope here.

Drying oven racks
Freshly extruded briquettes carry water from the binder and must be dried before packing; moisture left in the piece shows up later as weight, as smoke and as breakage.

The model: your two numbers, and what they do

Exactly two of the lines above reach a cost per finished tonne without a factory's output figure: the price you pay for charcoal, and the share of it you lose. Find your price along the top and your loss down the side. Each cell is the raw-material cost of one finished tonne, in US dollars — the arithmetic being that a tonne out needs more than a tonne in.

Raw-material cost of one finished tonne, in USD, by shell-charcoal price and loss
Loss about USD 420 (2022 brief)USD 622 (Dec 2024)USD 800USD 1,045 (Jul 2025)
0% 4206228001,045
10% 4666918891,161
20% 5247781,0001,306
30% 5998891,1431,493
40% 6991,0371,3331,742

Between December 2024 and July 2025 the market moved the price row by 68% (International Coconut Community figures, our arithmetic) — almost exactly what going from no loss to 40% does down a column: 67%. So two numbers decide the answer: the price, which the market sets and dates, and the loss, which no factory publishes. A quoted price says something about a factory's process control, not only about its shell supplier.

A worked example, with numbers that are not ours. Take shell charcoal at USD 900 per tonne and a loss of 25% — each a round figure, not a figure anyone measured. One finished tonne then needs 1,333 kg of charcoal, and the raw-material line comes to USD 1,200 per tonne. Add your own labour, power, binder, fuel, packaging and overhead, converted at the rate on the day. Every input in that sentence is illustrative. None of it is our cost, and we publish no cost figure of ours anywhere on this site.

What this page does not contain

Our own cost — not here and not elsewhere, because a supplier's cost breakdown is its margin stated backwards. What we do publish is a dated grid of five tiers, each defined by the ash band it guarantees, on the pricing page: a price, not a cost. Prices valid November 2026 · reviewed monthly.

From there: what actually moves the per-tonne figure on a quote is at price per ton drivers; why an order starts at a full container is at why the minimum is one container; the same arithmetic from a brand owner's side is at private-label margin math; and the terms a wholesale order is bought on are at wholesale.

Cutting and sizing
Extruded lengths are cut to size after forming, which is how one die produces several catalogue sizes — for example the finger range at 35 mm and 50 mm lengths.

Common questions

What does it cost to produce a tonne of coconut shell charcoal briquettes?
Nobody can answer that for a factory they do not run, and we publish no figure of our own. What can be answered is which lines the number is made of. Three have public instruments you can open yourself — a governor's decree for wages, a published tariff for electricity, a market review and a parliamentary brief for raw material. The rest depend on how a particular plant runs, and the largest of them is published by nobody.
Which cost line matters most?
Two lines. The shell-charcoal price is set by the market, and it rose steeply between December 2024 and July 2025, according to the International Coconut Community. Material loss is the other: charcoal that does not leave as saleable briquettes is paid for twice, once as raw material and once as production time, and no factory publishes the figure.
How much is labour in Indonesia?
It is set district by district, not nationally. One West Java decree fixes 27 different monthly minimums for 2026, and they run from Rp 2,351,250 to Rp 5,999,443 — the top of the province is about 2.55 times the bottom, under one instrument, in one province. Our production site is in Kabupaten Bogor, which is Rp 5,161,769. And the decree binds only workers with under a year of service; beyond that the employer's own wage structure applies.
How much is industrial electricity in Indonesia?
For the quarter to September 2026, PLN's medium-voltage industrial band above 200 kVA is Rp 1,122 per kWh and the high-voltage band from 30,000 kVA is Rp 997. The more useful fact is the mechanism: the tariff is re-set every three months against the rupiah, the Indonesian crude price, inflation and the coal reference price, so a cost model built on one quarter's number has a three-month shelf life.
Why will a supplier not show me their cost breakdown?
Because it is their margin, stated backwards. That is an ordinary commercial reason rather than a suspicious one, and a supplier declining to give it is not a red flag. What you can reasonably ask for is the things a cost model needs in order to be checked at all: the incoterm, the grade as a measured band, the packaging, and the date the price was set.
Can I work out a supplier's margin from their quoted price?
Not reliably, and the attempt usually misleads. It would take their loss rate, their yield, their energy use per tonne and their overhead recovery — four numbers nobody publishes, and the first swings the answer more than the rest combined. A public cost model is good for the opposite direction: checking whether a quote is implausibly low for the region it claims to come from.

Check a quote against a dated price

If you are testing whether a quote is plausible, the fastest check is a dated one. Message the export desk on WhatsApp with your shape, ash band, packaging and port, and ask for the date the price was set.